Project-Level Conformity

The San Joaquin Valley is currently designated as nonattainment with respect to Federal air quality standards for ozone and PM 2.5; and has a maintenance plan for PM-10. As Kern County’s transportation planning agency, Kern COG is responsible for demonstrating that transportation plans and programs satisfy the requirements of the Clean Air Act.

Project-Level Conformity (Hot-spot Analysis) process involves scheduling a combined interagency call and public meeting to review each non-exempt project and PowerPoint presentation associated with each project sponsor. The Meeting Agenda, Project Checklist and Power point Presentation need to be post on Kern COG website 2 weeks before the virtual meeting.  This new process allows public and agency partners, including Caltrans, FHA, and EPA, to ask project-related questions directly and confirm determinations “live” during the conference to determine if the project is not a Project of Air Quality Concern (POAQC). Final documents will be uploaded on Kern COG’s website for public review and comments.

Each MPO is responsible for posting project information on their respective websites, responding to public comments, and organizing Interagency Consultation (IAC) calls that are open to public attendance.

For more information, please visit:

 Project-Level Conformity and Hot-Spot Analyses | US EPA

Clarifications on Exempt Project Determinations | CA DOT

If you want to summit your projects for Determination, please fill the Checklist and the SJV PM Hot-Spot Presentation Template.

SJV Hot Spot Checklist V3.1 (Adobe PDF)

SJV Hot-Spot Checklist V3.1 (MS Word)

SJV PM Hot-Spot Presentation Template

Contact Vincent Liu vliu@kerncog.org  or call 661-319-3131 with any questions.

2025

City of Bakersfield – Adaptive Signal Coordination Project along Panama Lane CML – 5109 (291)

Meeting Materials:     Agenda        Draft Presentation      Hot Spot Checklist

Comments were due to be submitted to Vincent Liu, VLiu@kerncog.org through April 21, 2025, at 5pm.

City of Bakersfield – H Street Corridor Improvements – A TPCML 5109(295)

Meeting Materials:     Agenda        Draft Presentation      Hot Spot Checklist

Comments were due to be submitted to Vincent Liu, VLiu@kerncog.org through April 1, 2025, at 5pm.

H Street Corridor Improvements Final Project Level Conformity Determination Documentation

2024

Caltrans – SR 155/Lexington Street Intersection Improvement Project in Kern County

Meeting Materials:     Agenda        Draft Presentation      Hot Spot Checklist

Comments were due to be submitted to Vincent Liu, VLiu@kerncog.org through December 9, 2024, at 5pm.

SR155/Lexington Intersection Improvement Final Project Level Conformity Determination Documentation

On December 10, 2024, Caltrans and EPA concurred that the SR 155/Lexington Street Intersection Improvement Project was NOT a POAQC.

Air Quality Conformity

Transportation Conformity requirements for highway and transit projects are defined by U.S. Environmental Protection Agency (EPA) regulations, US EPA and US DOT (FHWA) guidance, and local consultation procedures set up by Metropolitan Planning Organizations and Air Pollution Control Districts to achieve and maintain Federal air quality standards.

Regional analysis addresses the effect of all regionally significant projects in a nonattainment area. The regional analysis considers the Design Concept (what type of project it is) and scope (how long, capacity, etc.) of all projects to be implemented by various analysis years. Regional conformity must be determined not less often than every 4 years by a MPO with a nonattainment or maintenance area, and usually is analyzed more often as Regional Transportation Plan and Federal Transportation Improvement Program amendments happen.

On July 18, 2024, the Kern COG Board of Directors adopted the 2025 Federal Transportation Improvement Program and 2024 Air Quality Conformity Analysis. State and Federal approval is required.

 

Project-Level Conformity Interagency Consultation Meeting for SR 155/Lexington Street Intersection Improvement Project, Kern County – Virtual Meeting was held Tuesday, December 10, 2024 10:00 – 10:30 am

Meeting Materials:     Agenda        Draft Presentation      Hot Spot Checklist

Comments were due to be submitted to Vincent Liu, VLiu@kerncog.org through December 9, 2024, at 5pm.

SR155/Lexington Intersection Improvement Final Project Level Conformity Determination Documentation

 

2024 Conformity Analysis 2022 RTP 2025 FTIP July 18, 2024
2022 Conformity Analysis 2022 RTP 2023 FTIP December 16, 2022
2021 Conformity Analysis 2018 RTP 2021 FTIP August 13, 2021
2020 Conformity Analysis 2018 RTP Amendment 1 2021 FTIP April 16, 2021
2015 Ozone Conformity Analysis 2018 RTP 2019 FTIP Amendment 2 May 9, 2019
2018 Conformity Analysis 2018 RTP 2019 FTIP December 3, 2018
2017 Conformity Analysis 2014 RTP Amendment 2 2017 FTIP Amendment 9 October 19, 2017
2016 Conformity Analysis 2014 RTP Amendment 1 2017 FTIP September 15, 2016
2015 Conformity Analysis 2014 RTP 2015 FTIP Amendment 12 August 28, 2015
2014 Conformity Analysis 2014 RTP 2015 FTIP June 19, 2014
2013 Conformity Analysis 2011 RTP Amendment 5 2013 FTIP Amendment 9 November 4, 2013
2013 Conformity Analysis 2011 RTP Amendment 4 2013 FTIP Amendment 4 March 25, 2013
2013 Conformity Analysis 2011 RTP Amendment 3 2013 FTIP July 19, 2012
2011 Conformity Analysis 2011 RTP Amendment 2 2011 FTIP Amendment 10 April 19, 2012
2011 Conformity Analysis 2011 RTP Amendment 1 2011 FTIP Amendment 7 September 15, 2011
2011 Conformity Analysis 2011 RTP Amendment 1 2011 FTIP Amendment 4 May 19, 2011
2011 Conformity Analysis 2011 RTP 2011 FTIP July 15, 2010
2009 Conformity Analysis 2007 RTP Amendment 2 2009 FTIP Amendment 8 September 18, 2009
2009 Conformity Analysis 2007 RTP Amendment 1 2009 FTIP Amendment 2 January 15, 2009
2007 Conformity Analysis 2007 RTP 2007 FTIP Amendment 6 October 18, 2007
2007 Conformity Analysis 2007 RTP 2007 FTIP Amendment 3 May 17, 2007
2006 Conformity Analysis 2004 RTP 2006 FTIP July 20, 2006
2006 Conformity Analysis 2004 RTP 2004 FTIP February 24, 2006
2005 Conformity Analysis 2004 RTP 2004 FTIP April 21, 2005
2004 Conformity Analysis 2004 RTP 2004 FTIP August 19, 2004
Draft 2002 Conformity Analysis 2000 RTP 2002 FTIP May 2002

 

Translate
Like us on Facebook

Copyright 2017 Kern COG - All rights reserved. Powered by Fluxar Studios • Powered by Fluxar Studios2